Santiago Metro announced on Saturday a series of modifications to the Line 5 Express Route system. The measure aims to optimize passenger circulation on the segment connecting the Vicente Valdés and Plaza de Maipú stations.
As reported by the company via a video on its social media channels, the change involves a reconfiguration of the Red and Green route categories at three specific stations. The entity stated that the goal is to "better balance passenger flows and improve the travel experience."
Station Changes
According to technical details released by BioBioChile, the modifications will affect the following stops:
Camino Agrícola, which previously operated exclusively as part of the "Red Route," will become a standard station serving both the Red and Green routes. Meanwhile, Mirador station will be removed from the "Red Route" to be integrated into the "Green Route." Finally, Pedrero station will undergo the reverse change, moving from the "Green Route" to the "Red Route."
The outlet El Mostrador noted that this adjustment seeks to better distribute the passenger load on platforms, particularly during peak congestion periods. The report also highlighted that the announcement comes following a week of scrutiny regarding service issues caused by infrastructure and equipment failures.
Implementation and Recommendations
There is currently a discrepancy regarding when these changes will take effect. While BioBioChile indicates that the changes will go into effect this Monday, El Mostrador reported that the company has not yet confirmed an exact implementation date, stating only that it will occur over the coming weeks.
To prevent confusion, Santiago Metro issued a cautionary message to commuters using this sector. The company emphasized through its official channels: "Look before you board. Your destination remains the same; only the color changes."
CNN Chile recommended that passengers at the affected stations verify the new operating conditions before traveling. The state-owned company reiterated that the restructuring of these three stations will be carried out gradually over the next few weeks.


